|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
OHS requirements: | are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:personal protective equipment and clothingsafety equipmentfirst aid equipmentfire fighting equipmenthazard and risk controlfatigue managementelimination of hazardous materials and substancessafe forest practices including required actions relating to forest firemanual handling including shifting, lifting and carrying |
Environmental requirements may include: | legislationorganisational policies and proceduresworkplace practices |
Legislative requirements: | are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:award and enterprise agreementsindustrial relationsAustralian Standardsconfidentiality and privacyOHSthe environmentequal opportunityanti-discriminationrelevant industry codes of practiceduty of care |
Organisationalrequirements may include: | legal organisational and site guidelinespolicies and procedures relating to own role and responsibilityquality assuranceprocedural manualsquality and continuous improvement processes and standardsOHS, emergency and evacuation proceduresethical standardsrecording and reporting requirementsequipment use and maintenance and storage requirementsenvironmental management requirements (waste minimisation and disposal, recycling and re-use guidelines) |
Optimisationof CNC machines | is the process of maximising a program to direct a piece of CNC equipment to undertake the sequence of work and maximise output |
Productionpotential | is the capacity of CNC equipment to produce output at a faster rate and in a more efficient way based on improving program formats |
Productionorders may include: | number of products to be producedtreatment to be applied (sizing or machining activity) |
Integrationorders are to include: | instructions to collate two or more sets of software information established through a common identifier |
Software | is the programs and other operating systems used by a computer |
Communication may include: | schedulesverbal and non-verbal languageconstructive feedbackactive listeningquestioning to clarify and confirm understandinguse of positive, confident and cooperative languageuse of language and concepts appropriate to individual social and cultural differencescontrol of tone of voice and body language |
Programformat is to include: | intended actions of the CNC machinetime it takes for intended CNC actions based on the limitations of the machinery and the cutters |
Softwaretimers | are the software component that schedules which activities occur at what point in the program format |
Externalloadingdevices | are computers (desktop, notebook or laptop) with disk drives able to be linked to the machine control system |
Machinecontrolsystem | is the computerised operating controls for the CNC machine which stores and runs the program at the direction of an operator |
Integrationprotocols are to include: | the compatibility of two or more sets of software information being collated to form a new program without corrupting |
Output | is the product intended for production, produced to the intended outcome following the program format in the intended time |
Externalinputs | involve feeding the program from the attached computer to the machine control system which is checked for accuracy with the program master |
Programmastercopy | is the final approved operating program which will be used to reset the CNC machine after maintenance or recalibration of componentsis stored in a safe location away from the CNC machine |
Recordsandreports may include: | planning and monitoring outcomesoperating logsperformance recordsmaterial movementquality outcomeshazardsincidents or equipment malfunctionsand may be:manualusing a computer-based system or another appropriate organisational communication system |