Elements and Performance Criteria
- Confirm operational status
- Operational status is confirmed within Occupational Health and Safety (OHS) regulations, environmental and safe working requirements/practices, Standard Operating Procedures (SOP), and housekeeping requirements
- Production requirements are checked at start of shift to plan the day's activities as required
- Continuing process supplies are maintained
- Power generation processes are confirmed to be within operational specifications
- Turbine performance is recorded in the operational log
- Operational status is communicated to relevant personnel
- Monitor and control power generation and ancillary plant operation
- Power generation and ancillary plant operation is monitored and controlled within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- Operational status is confirmed by inspection, observations and other information
- Process supplies are monitored as required
- Turbine pressures, temperatures and flows are measured as required
- Turbine and generation control adjustments are made to maintain operation within specification
- Power output demand and distribution systems operation is monitored and maintained to meet client requirements
- Record and document power generation and ancillary plant performance
- Power generation and ancillary plant performance is recorded and documented within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- Pressures, temperatures and flows are documented as required
- Operating log is maintained
- Maintenance requirements are identified and documented as required