Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for assembly
  2. Set up components
  3. Install assembly hardware
  4. Prepare products for despatch and report

Performance Evidence

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

construct products in line with an individual work order and construction plan for each. Products for construction will be one or more of the following:

pallets

crates

trellises

stairs

doors

windows

beams

strap, pack and label bundles of completed products ready for transportation.


Knowledge Evidence

A person competent in this unit must be able to demonstrate knowledge of:

environmental protection practices for forest products factory settings:

reducing water and energy use

cleaning plant, tools and equipment

disposing of, recycling and reusing timber

typical component defects and how these affect ability to produce a quality finished product:

warp

wane

cupping

shakes

insect defects

knots

resin pockets

assembly sequences

componentry and construction standards

typical assembly faults triggering correction to ensure product quality including:

incorrectly positioned joints

timber splits from nailing

incorrectly positioned hardware

storage layout and categories for stacking finished materials

types of tools and equipment used for assembling products; their purpose, features and operation:

measuring equipment

assembly jigs

nail plate presses

staple guns

nail guns

compressor or compressed air supply

marking equipment

strapping equipment

organisational procedures specific to assembling products:

workplace health and safety with particular emphasis on equipment lock out

use of equipment

communication reporting lines

recording and reporting production outcomes and equipment faults.