Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan boiler operation
  2. Coordinate boiler startup and operation
  3. Coordinate boiler shutdown, storage and records

Performance Evidence

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

plan and coordinate boiler operations for different operational periods in line with production requirements for each period

determine, document and communicate operational orders and boiler schedules for each of the above operational periods

monitor and assess boiler performance and steam generation levels during each of the above operational periods and modify levels to ensure optimum performance

complete records for operational outcomes for each of the above periods of operation

complete a detailed report about systematic issues arising across the operational periods covering problems with processes, outputs and equipment including recommendations for process improvements.


Knowledge Evidence

A person competent in this unit must be able to demonstrate knowledge of:

environmental protection practices for boiler operations:

cleaning plant, tools and equipment

disposing of hazardous substances

energy generation capacity of organisational steam generating boilers and methods used to calculate steam and energy generation levels

energy generation capacity of organisational steam generating boilers and methods used to calculate steam and energy generation levels

processes for boiler startup, shutdown and storage

methods of determining boiler schedules to meet production requirements

range of data used to evaluate boiler performance:

steam levels

pressure levels

energy generation levels

heat build-up

system overload information

test outcomes for water quality and chemicals

past performance records

methods used to:

diagnose problems with boiler operations

safely handle and store boiler house chemicals

inspect boilers after shutdown

format, content and use of:

operational orders

boiler schedules

operating logs and operational records

fuel efficiency records

process improvement reports

organisational procedures specific to planning and coordinating boiler operations:

communication reporting lines for operator team members and self

documenting operational orders, boiler schedules and reports

recording and reporting operational outcomes and equipment faults.