Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for rigging slinger operations
  2. Plan breakout
  3. Direct hook up of logs
  4. Assist with line shifts

Performance Evidence

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

safely and efficiently monitor log recovery

perform rigging slinger operations to recover felled logs in line with a work order and within prescribed organisational tolerances

plan the breakout process in line with site conditions

monitor log recovery using one or more of the following cable systems

high lead (no skyline)

standing skyline

running skyline

assist in shifting lines in line with the hook tender's instructions.


Knowledge Evidence

A person competent in this unit must be able to demonstrate knowledge of:

content and application of applicable state or territory code of practice relevant to log recovery activities

key features of these varying environmental conditions and effects on log recovery:

fallen trees

general forest lean

ground growth

ground hazards and obstacles

ground slope

density of trees

wet and adverse weather conditions

wind speed and direction

environmental protection practices for forest and forest farm settings:

safe disposal of waste material

cleaning of plant, tools and equipment

characteristics of trees

industry standard lengths for logs

techniques used by rigging slingers in the log recovery process:

log extraction methods

cable logging techniques

rigging techniques

key features of these varying signal systems used for log recovery activities:

talk-e-tooter signals

two-way radio

visual signals

whistle signals

typical industry chain of command for communication of information and instruction

purpose, features and operation of cable logging system components:

rigging components

cable systems:

high lead (no skyline)

standing skyline

running skyline

organisational procedures specific to log recovery activities:

workplace health and safety with particular emphasis on use of equipment

communication reporting lines

recording and reporting breakout process and equipment faults.