Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan saw log operations
  2. Coordinate saw log operations
  3. Evaluate saw log performance

Performance Evidence

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

follow organisational policies and procedures relevant to planning and monitoring saw log operations

planning and monitoring of saw log operations for the enterprise

modify cutting patters and schedules or saw log operations

coordinate personnel to follow planning, communications and scheduling for saw log operations


Knowledge Evidence

A person competent in this unit must be able to demonstrate knowledge of:

purpose, features and operation of equipment used for assessing logs

capacity of log sawing equipment and systems

methods used to assess logs for:

diameter

curvature

faults

species

moisture content

volume and type of flitches and cants that can be cut

stages of the log sawing process

typical flow of log supply in and out of the sawing area

cutting patterns used on logs to achieve maximum output of flitches or cants

methods of determining cutting schedules to maximise efficient handling of logs to be sawn

methods used to assess timber cutting processes for quality of outcomes and scheduling

format, content and use of:

cutting pattern documents

cutting schedules

work orders

operating logs and cutting records

process improvement reports

organisational procedures specific to planning and monitoring saw log operations:

communication reporting lines for sawyer team members and self

documenting cutting patterns, schedules, work orders and reports

recording and reporting systematic equipment faults.