Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for painting
  2. Paint panels
  3. Shut down and clean equipment

Performance Evidence

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

paint panels in line with individual work orders for each job; types of panels include:

medium density fibreboard

chipboard

fibreboard

plywood

at the completion of each of the above jobs:

shut-down and clean equipment in line with organisational safety procedures

dispose of excess paint in line with environmental protection practices

safely store unused paint

stack finished panels in storage location according to common size, thickness, length and coating.


Knowledge Evidence

A person competent in this unit must be able to demonstrate knowledge of:

environmental protection practices for painting panels:

reducing water and energy use

cleaning plant, tools and equipment

disposing of, recycling and reusing timber

disposing of hazardous substances

storage layout and categories for:

raw materials

stacking finished panels

characteristics of timber panels and the types of paint most suitable for application:

medium density fibreboard

chipboard

fibreboard

plywood

properties, at a basic level of understanding, of paints:

water based

oil based

solvent based

viscosity, film thickness and film wetness of paints

methods used to safely store paint

typical work flow processes for painting panels

purpose, features, operation, shut down and cleaning of painting equipment including:

roller coating lines

spray booths

curtain coating lines

trays

overflow trays

thinner reservoirs

spray guns

roller coaters

range of appropriate paint flow rates to avoid equipment blockages and optimise quality and quantity of production output

organisational procedures specific to surface painting panels:

workplace health and safety with particular emphasis on equipment lock out, use of personal protective equipment and handling hazardous substances

communication reporting lines

recording and reporting production outcomes and equipment faults.