Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Identify areas of poor performance
  2. Investigate methods to improve system performance
  3. Develop an implementation plan for system optimisation
  4. Modify system to optimise performance
  5. Monitor ongoing system performance

Required Skills

Required skills

basic analytical skills to

evaluate the collected system performance data

review and assess benchmarks and performance

communication skills to

evaluate system performance data related to organisational benchmarks

follow up on client feedback

liaise with technical team members

literacy skills to

document initial problem and make recommendations to solve problem

implement and maintain a performance register

read technical manuals organisational guidelines and support agreements

write reports that include cost analysis details

planning and organisational skills to

develop an implementation plan for system optimisation

develop plans with prioritised tasks

make contingency arrangements

minimise disruption to client

organise maintenance

problemsolving skills to

determine problems based on diagnostic tests

identify options to improve performance

solve unknown problems in a range of contexts

teamwork skills to review and assess benchmarks and performance with the work team

technical skills to

collect system performance data using available diagnostic and technical tools

install and configure system components

measure and record changes in performance resulting from system modifications

measure system performance against predefined benchmarks

Required knowledge

business scheduling requirements

current industrystandard hardware and software monitoring tools and how to interpret information produced from monitoring

system performance change control procedures and theoretical concepts

one or more changemanagement tools

quality assurance practices with regard to proposed changes to IT systems

role of stakeholders and the degree of stakeholder involvement

features and functions of the system under modification

current system functionality

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to

identify inadequacies in system performance

analyse system performance

tune the system to keep the system balanced and performing well

Context of and specific resources for assessment

Assessment must ensure access to

system components and software for performance tuning

technical manuals and resources

fault logs

diagnostic tools

appropriate learning and assessment support when required

modified equipment for people with special needs

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge The following examples are appropriate for this unit

direct observation of candidate performing system tests

verbal or written questioning to assess candidates knowledge

review of documentation recording system optimisation process

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector workplace and job role is recommended where appropriate

Assessment processes and techniques must be culturally appropriate and suitable to the communication skill level language literacy and numeracy capacity of the candidate and the work being performed

Indigenous people and other people from a nonEnglish speaking background may need additional support

In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Tools may include:

electronic test equipment:

data analyser

oscilloscope

voltmeter

software.

System performance may be related to:

allocation of files across disk space

disk speed

I/O channel availability

imbalances in disk use and available space

memory availability and use

number of concurrent users

physical limitations of system

poor design in a programs

processor use

queue depth

seek time

work load.

Client may include:

employee

external organisation

individual

internal department.

Improving performance may include:

load balancing between servers or other network devices using switches or routers

reducing total load by tuning the operating system

tuning applications to reduce the load they impose

tuning the disk sub-system

using various system tools to adjust system parameters, including hardware or software upgrade.

Appropriate person may include:

authorised business representative

client

project manager

supervisor.

Components may include:

CD and DVD drives

central processing unit (CPU)

complementary metal oxide semiconductor (CMOS) battery

fax or modem cards

interface cards

motherboards

random access memory (RAM).

Organisational guidelines may include:

communication methods

content of emails

dispute resolution

document procedures and templates

downloading information and accessing particular websites

financial control mechanisms

opening mail with attachments

personal use of emails and internet access

virus risk.

Documentation may follow:

audit trails

International Organization for Standardization (ISO), International Electrotechnical Commission (IEC) and Australian Standards (AS)

naming standards

project management templates

report writing principles

version control.