Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Monitor operation
  2. Check quality
  3. Pack envelopes

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the following is essential

safely operate and monitor production on an inline mail machine and correctly notify supervisor when problems arise

demonstrate all safety devices on the machine

the individual will complete TWO entire jobs that include multiple inserts

evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity

Context of and specific resources for assessment

Assessment must ensure

assessment may take place on the job off the job or a combination of these

off the job assessment must be undertaken in a closely simulated workplace environment

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge The following examples are appropriate for this unit

direct questioning combined with review of portfolios of evidence and third party workplace reports of onthejob performance by the candidate

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector workplace and job role is recommended for example

ICPSUC Reconcile process outputs

ICPSU243C Reconcile process outputs.


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Mailing procedures may include:

job could be mailed or returned to client.

Machine may include:

intelligent in-line cut sheet form feeder, folder and inserter.

Units may include:

hoppers, folders, inserters, folders, accumulator, sealers, exit conveyors.

Materials may include:

printed multiple or single inserts and envelopes, water for gluing, glue.

Mailtype may include:

full rate, National pre-sort, DPID.