Elements and Performance Criteria
- Confirm job specifications
- Set up machine
- Die or block is selected and checked against job ticket
- Die or block is locked into chase and checked for correct positioning
- Chase is mounted in press
- Foil transfer or feed system is set up and adjusted according to image size and job specifications
- If required, in-line loading and ejection units are set up for basic processes and adjusted according to machine requirements and job specifications
- Set up reel system (OR Element 4 OR Element 5)
- Unwind and rewind reels are is set up and adjusted according to job specifications
- Webbing procedures are carried out and web-control system is set up and adjusted according to job specifications
- Reels are spliced/joined according to job specifications
- Printed web viewing devices are set up and adjusted according to job specifications
- Folder and sheeter are set up and adjusted suit job specifications
- Set off/marking prevention devices are set up and adjusted according to job specifications
- Set up sheet system (OR Element 3 OR Element 5)
- Feeder and delivery is set up and adjusted according to job specifications
- Sheet pick-up and transportation system is set up and adjusted according to job specifications
- Transfer and control systems are set up and adjusted according to job specifications
- Set off/marking prevention devices are set up and adjusted according to job specifications
- Substrate is added to and removed from process according to job instructions
- Set up product jigs onto machine table (OR Element 3 OR Element 4)
- Select foils
- Foils are selected according to job specifications and end-user requirements
- Quality and suitability of foils are checked and appropriate action is taken
- Foils are selected according to suitability of substrate, physical and chemical performance and properties
- Foils are prepared according to OHS requirements, and manufacturer's/supplier's instructions with suitable precautions to minimise waste
- Foils are appropriately labelled, handled and stored according to manufacturer's/supplier's instructions to prevent damage and hazards to personnel and prolong shelf life
- Conduct proof run
- Material to be used for proof is organised correctly
- Machine is operated according to manufacturer's and enterprise procedures to produce a specified proof
- Proof is visually inspected and/or tested or laboratory testing organised according to enterprise procedures
- Production does not commence without client OK or authority where appropriate
- Results are interpreted and adjustment changes are carried out according to product and machine specifications to determine adjustment requirements