Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Identify job requirements
  2. Prepare machine to print
  3. Produce proof print
  4. Run job and monitor print quality
  5. Carry out routine user maintenance
  6. Stack production output
  7. Conduct shutdown

Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

outline the information that can be gained from material safety data sheets (MSDS)

explain why it is necessary to check the substrate for conformance to the job specifications

describe the action required if the ink did not comply with the job specifications

explain what compliance checks are made with the stencil

determine what limitations occur when setting the substrate position

describe the result if too much ink is applied to the screen

explain why it is necessary to keep equipment clean

outline the work health and safety (WHS) concerns when producing a manual print

explain what is checked on the printed sheet when the proof print has been run off

explain what determines the drying or curing system used for this application

explain where to obtain product and machine specifications

confirm what the result would be if the belt speed was too high

explain why it is necessary to obtain final approval before commencing the production run

identify aspects of the print that are evaluated during printing

explain why it is necessary to make ink alterations during the run

explain what happens to the workplace documentation when the print run is completed

determine what WHS concerns there are in relationship to drying or curing systems

explain what maintenance should be carried out on this machine

explain why it is important to report any faulty equipment

explain how to determine whether a print is dried or cured prior to stacking

explain what the result would be if stacking occurs while the ink film is still wet

describe the possible action needed if problems occur with the job progress

explain how to identify the job’s destination when the run has been completed

explain the result of not keeping screens and squeegees clean

describe the result of not following correct procedures when disposing of liquid waste

explain the result of not keeping equipment and surrounding areas clean

identify required manuals, safety and other documentation and briefly outline the relevant information in each source.