Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Load substrate
  2. Apply ink to screen
  3. Produce proof print
  4. Run job and monitor print quality
  5. Carry out routine user maintenance
  6. Stack production output
  7. Finish operation

Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

outline criteria for selecting the correct substrate for the job

summarise ink and substrate compatibility

describe the characteristics of solvents and ink additives and the best method to determine their compatibility

outline the method that is used for checking the screen, ink, substrate and selection of squeegee prior to printing

describe the routine maintenance that is required on the printing base

explain lay edge on the equipment

describe the correct position, register and process of locking the screen in position

explain off contact distance

describe the selection of a drying or curing system

describe the process for calculating the ideal belt speed for a print run

list the health and safety concerns when producing a manual print

explain the need to condition some substrates

outline the procedure for checking the correct viscosity of ink during the print run and ways of rectifying any problems

outline the evaluation process and maintenance of print quality during the run

describe the procedure for checking and stacking production output

describe the correct method of cleaning squeegees, equipment and the surrounding area

identify required manuals, safety and other documentation and briefly outline the relevant information in each source

describe other sources of available information that are relevant to the job.