Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Identify production requirements and capacities
  2. Prepare production schedule for small work unit
  3. Monitor production

Required Skills

Required skills

OHS in relation to operating machinery such as safely switching off machinery before cleaning is started

communication of ideas and information by liaising with production management and customers

collecting analysing and organising information by monitoring production and determining changes required in scheduling

planning and organising activities by sequencing machinery as efficiently as possible

teamwork when liaising with other production processes and stores to ensure materials are available

mathematical ideas and techniques by calculating required consumables and run times of jobs

problemsolving skills by adjusting schedules to minimise machine down time andor to accommodate rush jobs

use of technology by using production control software

Required knowledge

production requirements and capacities

job requirements that determine the production processes

identifying special production requirements and possible problems

criteria that are used to determine availability of machines materials and labour

OHS concerns that need to be considered when planning production

checking stock levels

checking internal stock levels

information that you obtain from outside suppliers that will allow you to establish job priorities

system that you use to select alternative suppliers

preparation and documentation of the production schedule

determining production workflow

system used to work out job priorities

purpose of documenting production workflow

communicating schedules to the workforce

revising schedules

monitoring and amending production schedules if required

consideration that is given to revising production schedules to take into account customer requirements and job complexity

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to

effectively scheduling production for a small work unit

produce a portfolio that shows all appropriate paperwork for one months scheduling according to the listed Performance Criteria for a single small production unit in prepress printing screen printing converting or finishing

evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity

Context of and specific resources for assessment

Assessment must ensure

assessment may take place on the job off the job or a combination of these Off the job assessment must be undertaken in a closely simulated workplace environment

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge The following examples are appropriate for this unit

direct questioning combined with review of portfolios of evidence and third party workplace reports of onthejob performance by the candidate

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector workplace and job role is recommended


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Print processes may include:

any processes in pre-press, press, finishing, screen printing.

Scope of scheduling may include:

applies to the scheduling for a single small production work unit or production cell, or workstation or work unit; or a single production process where there are only a small number of constraints or variables. The scheduling applies to only a part of the overall production process.