Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare or set up substrates (or loads)
  2. Set up delivery systems
  3. Prepare machine
  4. Conduct shutdown of production process
  5. Clean and wash up machine at end of run

Range Statement

This section specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Delivery systems MUST include EITHER:

reel

OR

sheet

Setting up and adjusting MUST include EITHER:

unwind and rewind reels

webbing procedures and web control systems

splicing/joining reels

folder and sheeter

OR

feeder

sheet/production pick-up and transportation system

transfer system

delivery systems



Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

explain how to avoid back strain when lifting heavy objects

summarise best-practice handling of supplies, parts and finished product

outline how to avoid damaging finished product

identify supplies that require special handling

list health and safety considerations when preparing substrates and setting up a machine

outline health and safety procedures for operating machinery, such as safely switching off machinery before cleaning

summarise procedures for disposal of faulty materials

identify possible danger areas of the machine

describe location and function of registration section of the machine

describe problems that can interrupt the running cycle of the machine

list areas of the machine that are modified during shutdown

identify areas of the machine to check for possible repair

describe details to include when labelling unused ink

identify health and safety considerations for washing a machine

explain how ineffective wash-up can affect the next production run