Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare cable support installation
  2. Determine cable routes
  3. Determine support method
  4. Mark out and install fixings and support structure
  5. Complete support installation

Performance Evidence

Evidence of the ability to:

plan a cable route and cable support system

interpret plans and schematic drawings to verify cable layout

install three different support structures:

catenary wire

ducts and/or trays

frame back-mounts

complete cable support installation, applying relevant regulations, standards and work practices

comply with all related work health and safety (WHS) requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.


Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

summarise building construction methods of commercial buildings as they relate to routing cables

describe features and operating requirements of cable installation equipment

identify other services that may impact on cable installations

describe cable installation support methods and their performance features

outline legislation, codes of practice and other formal agreements that impact on the work activity

discuss typical safety issues and challenges that occur on a commercial installation site.