Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare cable termination
- Arrange access according to customer and individual worksite requirements
- Prepare for cable terminating work within regulatory environment, cabling environment, cable type, cable identification, termination systems, earthing and protection, records and relevant legislation, codes, regulations and standards
- Select correct termination for installation according to strategies to manage infrastructure and relevant legislation, codes, regulations and standards
- Notify appropriate personnel of identified safety hazards at cabling worksite
- Identify remote power feeding services that operate at above telecommunications network voltage (TNV) inside customer premises, and risks posed by contact with remote power feed
- Remove all contaminants from worksite that may adversely affect termination and prepare worksite to ensure adequate visibility to minimise errors and reduce eye strain
- Design cable and block location within frame with capacity for expansion where possible
- Segregate incoming and outgoing cables for ease of access and to minimise overlaying and backtracking of cable
- Terminate cable
- Test termination
- Complete records and clean up site
Performance Evidence
Knowledge Evidence