  1. Prepare cable termination
  2. Terminate cable
  3. Test termination
  4. Complete records and clean up site

Performance Evidence

Evidence of the ability to:

plan and prepare for cable termination activity

terminate systems at both distributor and outlet locations

terminate one jumperable distributor (campus distributor or building distributor) with a capacity of 100 pair or greater and one non-jumperable distributor (local distributor) and a patch panel

terminate at least one 50 pair, one 4 pair ethernet unshielded twisted pair (UTP) data cable and one ethernet shielded twisted pair (STP) data cable, including accurate completion of installation records, drawing alterations and compliance forms

use correct methods to terminate a range of cables

conduct and interpret cable test results on a minimum of three different lead-in faults

interpret and apply relevant legislation, codes, regulations and standards

update records and plans to show cable locations

comply with all related workplace health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.


Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

describe the features and operating requirements of testing

explain how to operate termination tools to manufacturer's guidelines

outline legislation, codes of practice and other formal agreements that impact on the work activity

describe how to install and maintain cabling products to manufacturer's guidelines

discuss specific WHS requirements relating to the activity and site conditions

explain termination methods and performance requirements

discuss typical issues and challenges that occur on site.