Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to construct underground work
  2. Install enclosure
  3. Install connecting pipe works
  4. Complete project

Performance Evidence

Evidence of the ability to:

interpret and apply design plans and prepare for construction

install enclosures including pipe, pit and prefabricated manhole

construct in two different soil types: sand, rock, soil or combination soil types

shore an excavation site to meet enterprise and regulatory requirements

demonstrate use of specialised hand or power tools and equipment normally used for excavation, pipe, conduit installation and site restoration safely

complete the works and documentation

apply related work health and safety (WHS) requirements and work practices associated with excavation, enclosure installation and site restoration.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.


Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

describe the following elements of civil construction:

construction plant, tools and equipment operation

enclosure construction methods

foundations

plans

identify legislation, codes of practice and other formal agreements that impact on the work activity

identify the manufacturer’s requirements for safe operation of equipment

identify specific WHS requirements relating to the activity and site conditions

identify typical issues and challenges that occur on site.