Elements and Performance Criteria
- Plan for restricted cabling work
- Prepare for restricted cabling work within the ACMA regulatory environment, cabling environment, cable type, cable identification, termination systems, earthing and protection, records and according to requirements of relevant legislation, codes, regulations and standards
- Identify building infrastructure which places critical constraints on cabling
- Develop strategies to manage other infrastructure in relation to cabling
- Notify appropriate personnel of safety hazards at the cabling work site
- Manage remote power feed
- Install cables and protective earth wires
- 3.1 Install cables according to manufacturer's application specifications, including tension and bending stress requirements
- Identify and avoid sources of possible damage to cable, including hot pipes, sharp edges and cable burn
- Allow sufficient excess at cable ends to facilitate termination
- Place and secure cable to maintain safety and interference segregation according to legislative and industry standards
- Install cable fasteners (ties are specific, fasteners includes ties, Velcro or even rap straps) with correct tension to prevent cable sheath damage or transmission impairment and trimmed flush to prevent risk of personal damage
- Install over-voltage protection devices according to Australian Standards to all cable pairs, where required, to suppress voltage surges and protect from earth potential rise (EPR) hazards and protectively earth the devices
- Protect earth wire insulation against damage and segregate protective earths according to relevant legislative and industry standards
- Terminate and test cables and earth wires
- Remove cable sheath to allow for correct termination length and without damage to underlying conductors and their insulation
- 4.2 Install Network Termination Device (NTD) modules according to manufacturer's specifications and cable pairs neatly and sequentially fanned for termination
- 4.3 Terminate conductors according to recommended colour code sequence using appropriate termination tools in the manufacturer's specified manner
- 4.4 Earth cable shield, if applicable, to manufacturer's specifications, relevant industry codes of practice and Australian Standards
- Conduct visual inspection to confirm termination colour code sequence has been followed prior to end-to-end testing of wire and pair termination integrity
- Terminate earth wire according to industry accepted codes of practice and Australian Standards
- Maintain earth wire continuity throughout
- Test earthing installation for continuity, insulation resistance and conductive resistance according to accepted industry standards and Australian Standards
- Confirm compatibility of alterations with existing systems and test new work both in isolation and when integrated with existing systems
- Inspect cable route to ensure correct separations
- Create records
- Monitor work activity