Elements and Performance Criteria

  1. Prepare cabinet and termination frame for jumpering
  2. Jumper terminal blocks on frame
  3. Test jumpering and seal closure
  4. Complete records and restore site

Performance Evidence

Evidence of the ability to:

plan and prepare for jumpering activity including:

arranging safe access to site

identifying special services and remote power feeds a

following appropriate procedures

carry out jumpering activity including:

populate terminal frames with new terminal blocks where necessary

running jumpers through frame and terminate jumper to terminal blocks

using correct methods to terminate a range of jumpers

conducting tests and interpreting cable test results for several different types of lead-in faults

interpreting and applying relevant legislative requirements

finalise jumpering activity including:

updating records and plans to show cable locations

restoring site to required condition

obtaining final sign off.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.


Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

list the termination tools required for the work activity and explain how to operate them according to safety and manufacturer's guidelines

describe the features and operating requirements of testing equipment

describe the process used to install and maintain cabling products according to manufacturer's guidelines

outline legislation, codes of practice and other formal agreements that impact on the work activity

describe specific work health and safety requirements relating to the activity and site conditions

explain termination methods and performance requirements for jumpering activity

describe typical issues and challenges that occur on site and how to address them.