Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Scope the project
  2. Evaluate power requirements
  3. Evaluate requirements of air conditioning services
  4. Evaluate requirements of fire safety services
  5. Evaluate requirements of alarm systems
  6. Produce evaluation document

Performance Evidence

Evidence of ability to:

evaluate facilities used for housing network equipment and how they may be used for provisioning

produce documentation that correctly associates responsibilities to planning, provisioning, maintenance and operation of a building facility

evaluate planning requirements for telecommunications building facilities

determine equipment for air conditioning systems and power supplies into building facilities

determine requirements for energy use, alarm and fire safety services.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.


Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

outline these aspects of network planning:

alarm monitoring and hierarchy of responsibility

capacity of air conditioning system on a given load

different building services supported at a network site

describe basic monitoring and plant interrogation capabilities

outline complexities of various levels of alarm as applied to building facilities

identify general types of facilities within building housing network equipment

outline services and equipment, including:

types of air conditioning

types of fire safety services

types of power sources

equipment deployments on fire safety services

main energy loads associated in a facility

identify regulatory obligations in relation to fire safety services

identify software systems needed to allow alarm interrogation (outputs).