Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to install radio communications base station equipment
  2. Install equipment and terminate voice and data cables, power cables and radio frequency (RF) cables
  3. Connect receiver and transmitter multicoupling equipment to antenna feedline
  4. Finalise installation and complete preliminary tests and administrative tasks

Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

explain the following:

anti-static precautions

radio frequency (RF) radiation hazard awareness

network termination unit

radio transmitter system

radio receiver system

multicoupler

supervisory, control and data acquisition (SCADA) system inputs and outputs

outline the operation and purpose of testing equipment

interpret the meaning of various test results

identify network element and system specifications

outline the principles and performance testing and fault finding techniques of telecommunications networks

describe the practices and procedures for installation of radio communications equipment for the following:

fibre optic connector cleaning techniques

computer software installations to various devices

identify and describe the appropriate test equipment to undertake performance and fault-finding techniques in telecommunications networks including:

distance to fault measurement

return loss measurement

terminate data and voice and RF cable.