Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Establish area for drainage works
  2. Construct or restore ground drainage
  3. Construct or restore surface drains
  4. Maintain drainage systems
  5. Rehabilitate works area
  6. Complete necessary documentation

Evidence Required

Overview of assessment requirements

A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria The knowledge and skill requirements described in the Range Statement must also be demonstrated For example knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated

Critical aspects of evidence to be considered

Appropriate materials are selected for the construction and maintenance of the works

Appropriate construction methods and processes are used

Plans and specifications are adhered to

Safety on work site is ensured

Australian standards are met

Context of assessment

May be assessed

on the job

simulated workplace environment

written assignment

shortanswer test

oral questioning

observation

or any combination of the above

Relationship to other unitsprerequisite or corequisite units

To enable holistic assessment this unit may be assessed with other units that form part of the job role

Method of assessment

The following assessment methods are suggested

observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies

written andor oral questioning to assess knowledge and understanding

completion of workplace documentation

thirdparty reports from experienced practitioners

completion of selfpaced learning materials including personal reflection and feedback from trainer coach or supervisor

Evidence required for demonstration of consistent performance

Evidence will need to be gathered over time across a range of variables

Resource implications

In accordance with a range of variable requirements


Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Pipeline rehabilitation may include:

folded and formed liners

cured in-place resin liners

spiral wound liners

slip liners

pipe grouting machines

Drainage systems may include:

above and in-ground stormwater

wastewater

fittings

culverts

traps

drains

access holes

geofabric strip drains and cloth

Pipe types may include:

concrete

polyvinyl chloride (PVC)

steel and fibre concrete

corrugated PVC and steel pipes

recycled plastics

Relevant standards may include:

Australian standards and other relevant standards