Elements and Performance Criteria
- Divert or drain water from the work site
- Appropriate drainage is provided for diversion or containment of water from the work site to prevent damage to the environment.
- Environmental protection devices are installed as required to meet environmental regulations.
- Excavation is undertaken in accordance with drawings and specifications .
- Excavation is secured to prevent injury of employees and the public.
- Formwork/shoring is provided in accordance with drawings, specifications and relevant standards .
- Set up for bridge maintenance
- Respond to bridge maintenance
- Rejected or damaged timber is removed and replaced.
- Damaged steelwork is repaired, or removed and replaced.
- Concrete is placed and finished.
- Adjustments or repairs are made to surrounding fixtures and features.
- Coating materials are applied in accordance with best practice procedures and specifications.
- Temporary repairs are affected and safety barriers and signage are put in place.
- Lines are spotted and marked.
- Warning signs are erected and removed when all risks have ceased.
- Maintain records