Elements and Performance Criteria
- Prepare for installation
- Applicable legislative, OHS and organisational requirements relevant to installing rubber floor coverings are verified and complied with
- Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
- Sub-floor condition is assessed for suitability for installation of rubber floor coverings
- Suitable adhesives, trims and accessories are selected if required
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
- Set out materials
- Rubber floor covering to be installed is checked against order
- Rubber floor coverings are acclimatised according to manufacturers' recommendations
- Rubber floor coverings for fixing are organised and used in accordance with relevant safety management requirements
- Instructions and sequence for laying and fixing are followed
- Working lines and starting point are established
- Lay floor coverings
- Instructions and sequence for laying and fixing are followed
- Rubber floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
- Rubber flooring materials are accurately and clearly marked for cutting
- Rubber floor covering materials are cut to required shape ensuring minimum waste
- Rubber floor covering materials for fixing are organised and used in accordance with relevant safety management requirements
- Adhesives and edge strips/accessories are prepared for use as required
- Fixing methods and equipment are used following manufacturer recommendations
- Finished job is inspected and any imperfections are rectified following workplace procedures
- Complete housekeeping