Elements and Performance Criteria
- Prepare for installation
- Applicable legislative, OHS and organisational requirements relevant to install anti-static resilient floor coverings are verified and complied with
- Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
- Sub-floor condition is assessed for suitability for installation of anti-static sheet vinyl floor covering
- Suitable adhesives, trims and accessories are selected if required
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
- Set out materials
- Anti-static resilient floor covering to be installed is checked against order
- Vinyl floor coverings used in 'anti-static' installations are acclimatised according to manufacturer recommendations
- Vinyl floor coverings used in 'anti-static' installations are organised and used in accordance with relevant safety management requirements
- Working lines and starting point are established
- Lay floor covering
- Instructions and sequence for laying and fixing are followed
- Anti-static resilient floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
- Anti-static resilient flooring materials are accurately and clearly marked for cutting
- Anti-static resilient flooring materials are cut to required shape ensuring minimum waste
- Adhesives and edge strips/accessories are prepared for use as required
- Anti-static resilient floor coverings for fixing are organised and used in accordance with relevant safety management requirements
- Anti-static resilient floor covering is laid and fixed to meet job specifications
- Anti-static resilient floor covering fixing methods and equipment are used following manufacturer recommendations
- Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures
- Complete housekeeping