Elements and Performance Criteria
- Prepare for installation
- Applicable legislative, OHS and organisational requirements relevant to installing conductive resilient floor coverings are verified and complied with
- Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
- Sub-floor condition is assessed for suitability for installation of conductive resilient floor coverings
- Suitable adhesives, trims and accessories are selected
- Tools, equipment and materials are selected and checked prior to use, to ensure that they are appropriate for the work, serviceable and in a safe condition
- Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
- Materials are laid out to meet pattern and specification requirements and minimise waste and joins
- Set out materials
- Resilient floor coverings to be installed are checked against order
- Conductive resilient floor coverings are acclimatised according to manufacturers' recommendations
- Conductive resilient floor coverings for fixing are organised and used in accordance with relevant safety management requirements
- Working lines and starting point are established
- Lay floor coverings
- Instructions and sequence for laying and fixing are followed
- Copper grid and isolating layer are installed to specification
- Conductive resilient floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
- Conductive resilient floor coverings are accurately and clearly marked for cutting
- Conductive resilient floor coverings are cut to required pattern and shape with minimum waste of materials
- Conductive resilient floor coverings for welding and fixing are organised and used in accordance with relevant safety management requirements
- Welding and fixing methods and equipment are used following manufacturer instructions
- Conductive resilient floor covering is laid and fixed to meet job specifications
- Vinyl skirting, reducer and edge strips are set-out and installed (as required)
- Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures
- Complete housekeeping