Elements and Performance Criteria
- Plan for work
- Work requirements in the form of type of insect or security screen to be fabricated and installed are identified from work instructions. This includes the identification of its pattern or plan
- Workplace health and safety requirements for fabrication and installation of insect or security screens, including personal protection needs, are observed throughout the work
- The process for fabricating and installing insect or security screens is identified
- Quantities of materials required are calculated from plans or work instructions or by measuring the screen opening in accordance with Australian Standards and industry practice
- Cutting lists are prepared from plans, work instructions or measurements of opening to suit the type of screen to be installed
- Fittings, fixings and joining devices or materials are selected in line with specifications or type of materials to be joined or fixed
- Tools and equipment appropriate to the work method are identified
- Prepare for work
- Work sequence is determined in a logical order to suit the job
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Components of the insect or security screen are checked against specifications or job order for: size, quantity, finish and profile
- Fabricate and install insect or security screen
- Materials are measured and marked to cutting list requirements and most economical use of materials
- Materials are cut and stamped to cutting list requirements in accordance with workplace procedures or industry practice
- Components of insect or security screen are assembled in accordance with recognised industry standards
- Fittings are installed to screen in accordance with workplace procedures or industry practice
- Insect or security screen is installed in opening in accordance with recognised industry standards
- Complete work
- Installed insect or security screen is inspected for quality of work and repaired, refabricated or reinstalled as required in accordance with workplace procedures
- Material which can be reused is collected and stored
- Waste and scrap materials are removed for disposal or recycling as required
- Work area is cleaned and rubbish disposed of as appropriate
- Tools, equipment and unused materials are cleaned and removed and stored appropriately
- Workplace documentation is completed in accordance with workplace requirements