Elements and Performance Criteria
- Plan installation
- Work to be undertaken is identified from work/job/customer order
- Workplace health and safety requirements, including personal protection needs, are observed throughout the work
- Artwork to be installed is viewed to determine artistic and design characteristics and physical dimensions and shape
- Site for installation is visited and location, wall composition, fittings, attachments, hanging/fixing devices and any display features determined
- If necessary, a plan for installation is developed and necessary regulatory approvals for installation sought
- Customer approval of plan is gained
- Prepare for installation
- Specifications and/or plans are read and interpreted
- Attachments, fittings, hanging/fixing devices and display features are identified and ordered
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Artwork to be installed is prepared for safe and secure transit to work site
- Sequence of work is planned
- Install artwork
- Instructions and sequence for installation are followed
- Attachments, fittings, hanging/fixing devices and display features are organised and installed in accordance with relevant industry and workplace requirements
- Artwork is positioned in accordance with work requirement
- Completed installation is checked to ensure it meets required specifications
- Customer approval of installation is gained
- Complete housekeeping