Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan for rebuilding action, keys and pedals
  2. Prepare to rebuild
  3. Dismantle action and keys
  4. Rebuild parts
  5. Clean up work area

Required Skills

Required skills

communicate ideas and information to enable confirmation of work requirements plans and specifications coordination of work with other workers and customer and report of work outcomes and problems

complete standardized workplace information

work with others and in a team to rebuild pianos

use prechecking and inspection techniques to anticipate problems and identify tools or equipment faults and take appropriate action

participate in establishing new ideas and work specifications for tuning pianos and repairing faults

plan and organize activities to avoid any backtracking workflow interruptions rework or wastage including preparation and layout of the worksite and selection of tools and equipment

manage own work performance to

follow OHS and workplace practices

plan and organize work schedules and routines

maintain required production output

assess quality of own work

locate interpret and apply information on piano technology and the use and maintenance of hand and power tools

use workplace technology related to piano technology including specified tools equipment calculators and measuring devices for piano rebuilding

Required knowledge

State or Territory OHS legislation regulations standards and codes of practice relevant to the full range of processes for rebuilding actions keys and pedals on upright and grand pianos

organisational and site standards requirements policies and procedures for rebuilding actions keys and pedals on upright and grand pianos

reading and interpreting workplace documents including work orders work instructions and operator instructions

environmental protection requirements relating to the disposal of waste material

established lines of communication and protocols

terms used to describe components of an upright and grand piano

types characteristics uses limitations and preparation of materials and equipment used in rebuilding actions keys and pedals on upright and grand pianos

types of tools and equipment used to apply hardware and fixings and procedures for their safe use operation and maintenance

characteristics of hardware and fixings and their use

problem identification and resolution

set up and operation of tools and equipment used for rebuilding actions keys and pedals on upright and grand pianos

storage systems and labelling

procedures for the recording reporting and maintenance of workplace records and information

appropriate mathematical procedures for estimation and measurement

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Interpret work order locate materials and use information to complete tasks to rebuild upright and grand piano actions keys and pedals

Identify tools and equipment used in rebuilding actions keys and pedals

Select set up and maintain equipment in accordance with manufacturer specifications and workplace practices

Rebuild a minimum of two actions keys and pedals in both upright and grand pianos

Modify activities to cater for variations in workplace contexts and environment

Communicate and work with others in the work area

Apply safe handling practices and safe operating procedures for equipment products and materials to

minimise the risk of injury to self or others

prevent damage to goods equipment and products

Clean tools equipment and work area

Maintain and repair a range of hand and power tools used in piano rebuilding

Apply OHS practices when using hand and power tools holding and support equipment products and materials including use of personal protective equipment

Context of and specific resources for assessment

Assessment may occur on the job or in a simulated workplace environment in accordance with work practices and safety requirements

Assessment is to occur under standard work practices and to comply with legislative and regulatory requirements

The following resources should be made available

hand and power tools used in the repair and manufacture of pianos

materials used in the repair and manufacture of pianos

safety and personal protective equipment

holding and supporting equipment

workplace location or simulated workplace

upright and grand pianos

Method of assessment

Assessment must confirm consistency over time and in a range of workplace relevant contexts in application of skills and knowledge when

organising work

completing tasks according to instructions

working systematically with attention to detail

identifying improvements and avoiding damage

using workplace practices

using OHS practices

assessing operational readiness of tools and equipment

recognising and adapting to cultural differences in the workplace including modes of behaviour and interactions

Assessment must include a variety of project or work activities that allow the candidate to demonstrate competency in the unit

Assessment should be by direct observation of tasks and include questioning on required knowledge and skills to ensure correct interpretation and application

Assessment should be conducted over time and may be in conjunction with assessment of other units of competency


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

OHS requirements may include:

Relevant Federal, State or Territory OHS legislation, regulations, standards and codes of practice, and workplace policies and procedures including the use of personal protection equipment, hazard and risk control and manual handling.

Legislative requirements may include:

Relevant Federal, State or Territory legislation including award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, the environment, equal opportunity, anti-discrimination, industry codes of practice.

Workplace practices may include:

Site guidelines, policies and procedures relating to own role, quality assurance, procedural manuals, tool manufacturer's recommendations, ethical standards, recording and reporting, equipment use, maintenance and storage, environmental management (waste disposal, recycling, re-use).

Tools and equipment may include:

knives, guillotine, measuring equipment, centering equipment, glue brushes and sticks, glue pot

Personal protective equipment may include

Safety glasses, goggles, hearing protection, safety footwear, protective clothing, gloves, respiratory protection

Correct posture may include:

Standing or seating, according to type of piano and height of individual

Even distribution of body weight between both feet while standing, to reduce fatigue

Rest arm where available to aid control during tuning and reduce tiredness

Materials may include:

action felts and leathers, key bushings, key frame materials, springs, action components, key tops, pedal caps, pedal trap bushings, centre pins, hammer heads, bridle tapes

Rebuilding may include:

replacing the following with new components - hammer heads and assembly, wippen assembly, keys, action rails, pedals and trappings, springs, action brackets

Reconditioning may include:

repairing action components to an as new condition using existing parts with new materials

Workplace documentation may include:

Time sheets, customer cards, work orders including job sheets, cutting lists, plans, drawings and designs, tool maintenance records and schedules