Elements and Performance Criteria
- Plan to fabricate and install
- Applicable OHS, legislative and organisational requirements relevant to lead light and stained glass operations are verified and complied with
- The process for fabricating and installing lead light and stained glass windows and doors is identified
- Types and quantities of materials required are calculated from plans or work instructions or by measuring the fixture opening
- Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed
- Fittings, fixings and joining devices or materials are selected
- Tools and equipment appropriate to the fixing method are identified
- Prepare to fabricate and install
- Work sequence is determined in a logical order to suit the job
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Components of the lead light and stained glass window or door are checked against specifications or job order
- Fabricate and install
- Finalise the installation
- Installed window or door is inspected for quality of work and repaired, re-fabricated or re-installed as required
- Waste and scrap material is removed for disposal/recycling as required
- Work area is cleaned and rubbish disposed of as appropriate
- Tools, equipment and unused materials are cleaned and removed and stored appropriately
- Workplace records are maintained