Elements and Performance Criteria
- Identify work requirements
- Applicable occupational health and safety (OHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with
- The process for fabricating and installing leadlight and stained glass windows and doors is identified
- Types and quantities of materials required are calculated from plans or work instructions or by measuring the fixture opening
- Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed
- Fittings, fixings and joining devices or materials are selected
- Tools and equipment appropriate to the fixing method are identified