Elements and Performance Criteria
- Remove engine
- Aircraft is prepared and supported and rendered safe in accordance with the applicable maintenance manual and isolation tags are fitted, where necessary, to ensure the safety of personnel and freedom from damage during engine removal
- Removal is carried out in accordance with the applicable maintenance manual
- Engine is tagged and prepared for transport or storage in accordance with the specified procedures
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Remove engine system components
- Aircraft and/or engine system is prepared and rendered safe in accordance with the applicable maintenance manual and isolation tags are fitted, where necessary, to ensure the safety of personnel
- Removal is carried out in accordance with the applicable maintenance manual
- Engine system component is tagged and prepared for transport or storage in accordance with the specified procedures
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Install engine
- Engine to be installed is checked to confirm correct part or model numbers, modification status and serviceability
- Installation is carried out in accordance with the applicable maintenance manual
- Support/safety equipment is removed at the appropriate time to ensure personnel safety and freedom from structural damage
- 3.4 Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Install engine system components
- Engine components to be installed are checked to confirm correct part or model numbers, modification status and serviceability
- Installation is carried out in accordance with the applicable maintenance manual
- Support/safety equipment is removed at the appropriate time to ensure personnel safety and freedom from structural damage
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures