Elements and Performance Criteria
- Plan repair/modification
- Extent of damage is correctly assessed to assist in determining repair procedure
- Structure is supported and prepared in accordance with the applicable maintenance manual to ensure personnel safety and freedom from damage
- Appropriate modification or repair scheme is identified in accordance with structural repair manual and/or approved data
- Specialist advice is obtained in establishing an approved repair scheme where a standard repair scheme cannot be identified or damage criteria are out of limits
- All materials and equipment required are organised
- Repair/modify components using cold cure
- Lay-up of materials is checked to confirm that components meet required specifications and bagging equipment is correctly installed and operated
- Curing cycle is regularly monitored to ensure required specifications are met
- Components are checked for blemishes or delamination in accordance with quality procedures
- Component assemblies requiring further or special treatment are made ready for the appropriate processes
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
- Completed assemblies are tagged, sealed or packaged as required