  1. Determine work requirements

Required Skills

Required skills

Required skills include

literacy skills sufficient to read and interpret instructions relevant codes of practice and specifications for drawing work

using computer technologies and navigating software

numeracy skills sufficient to interpret technical information and conduct mathematical problem solving as required in the scope of this unit

using and maintaining drawing equipment

applying spatial principles to achieve scale and proportion

interpersonal skills to consult with other disciplines

using and interpreting process flow and PampID diagrams

classifying valves in terms of the duties they perform ie shutoff throttling and nonreturn

compiling cutting lists

identifying pipe fittings and components

identifying connections for valves ie screwed flanged or socket welded

applying symbols to identify pipe fittings

correctly using line thickness material and construction to identify parts and pipe lines

dimensioning the drawings

Required knowledge

Required knowledge includes

general knowledge of different approaches to drawing

awareness of copyright and intellectual property issues and legislation in relation to drawing

environmental and OHS issues associated with the tools and materials used for drawing

quality assurance procedures

Australian standard specification of pipes fittings and flanges

standard valves and auxiliary equipment

auxiliary equipment used in industrial piping

principles of producing orthogonal and isometric piping drawings

types of pipe fittings and components

different types of industrial pipe systems

terminology associated with industrial piping systems

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

A person who demonstrates competency in this unit must be able to interpret and apply drawing specifications and industry standards in the production of installation drawings for industrial piping systems

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria including required knowledge and be capable of applying the competency in new and different situations and contexts

Specifically the candidate must be able to

work within typical siteteamwork structures and methods

apply worksite communication procedures

comply with organisational policies and procedures including quality requirements

participate in work meetings

comply with quality requirements

use industry terminology

apply appropriate safety procedures

produce fully notated and detailed drawings for commercial or industrial piping systems

Context of and specific resources for assessment

This unit may be assessed on the job off the job or a combination of both on and off the job Where assessment occurs off the job that is the candidate is not in productive work then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team

Where applicable reasonable adjustment must be made to work environments and training situations to accommodate ethnicity age gender demographics and disability

Access must be provided to appropriate learning andor assessment support when required Where applicable physical resources should include equipment modified for people with disabilities

This unit could be assessed in conjunction with any other units addressing the safety quality communication materials handling recording and reporting associated with drafting or other units requiring the exercise of the skills and knowledge covered by this unit

Method of assessment

Assessors should gather a range of evidence that is valid sufficient current and authentic Evidence can be gathered through a variety of ways including direct observation supervisors reports project work samples and questioning Questioning techniques should not require language literacy and numeracy skills beyond those required in this unit of competency The candidate must have access to all tools equipment materials and documentation required The candidate must be permitted to refer to any relevant workplace procedures product and manufacturing specifications codes standards manuals and reference materials


Range Statement

Available information

Available information may include:

construction documents

building and coordination information

work specifications

information for plant services equipment

industry codes, standards and regulations

design brief

Piping systems

Piping systems may include:

petro-chemical

gas

water

wine and juice

Piping system fittings and components

Piping system fittings and components may include:

ball, stop, gate, angle and cocks

flanges, t-pieces, elbows, plugs, caps, unions, connectors and reducers

Piping drawings

Piping drawings may include:

standard shop details for pipe spools and pipe supports

standard shop drawings for layout and vendor equipment

single line and double line orthogonal arrangement drawings

transferring information from vendor equipment drawings to detail drawings

compiling cutting lists from arrangement and detail drawings