Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Erect structures
  2. Determine job requirements
  3. Comply with work health and safety (WHS) requirements at all times
  4. Use appropriate personal protective equipment (PPE) in accordance with SOPs
  5. Identify job requirements from specifications, drawings, job sheets or work instructions
  6. Inspect and prepare erection site
  7. Report non-compliance with specifications to appropriate authority
  8. Undertake minor alterations, corrections or adjustments with approval of appropriate authority
  9. Prepare all surfaces and materials/components for use
  10. Identify and check structure components against specifications
  11. Prepare structure components for correct sequential erection
  12. Erect components and fix according to specifications
  13. Adjust structures to specifications
  14. Ensure all reports and documentation is completed to required specifications

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Levels include the following:

straightforward levelling and alignment using plumb bob/lines and levels

Appropriate authority includes one (1) or more of the following:

site supervisor

building inspector

contractor

Materials/components include one (1) or more of the following:

ferrous and non-ferrous materials of a:

variety of material sizes

variety of borne loads

variety of joining systems

variety of component profiles

Prepared includes one (1) or more of the following:

cleaning

assembly sequencing

surface finishing

Structures include one (1) or more of the following:

metal frameworks

portals

stairways

walkways

vessels

tanks

platforms

conveyors

moving lines

associated railings

Reports and documentation include one (1) or more of the following:

contract documents

building inspection documentation

compliance reports