Elements and Performance Criteria
- Inspect and prepare installation site
- Site is checked for correct location, dimension and levels etc. utilising appropriate measuring equipment.
- Non-compliance with specification is reported to appropriate authority.
- Alteration/correction is undertaken with approval of appropriate authority.
- All surfaces, materials and components are prepared for use.
- Install machine/plant
- All work is carried out safely and in accordance with site procedures and to Australian standards.
- Machine components are prepared for correct sequential installation.
- Machine/plant is installed in accordance with manufacturers' and site specifications.
- Routine modifications/alterations are undertaken to standard operating procedures where required.
- Machine/plant is levelled, aligned, coupled and connected (excluding electrical connections) in accordance with specifications.
- Site is cleaned and cleared of all debris and left in safe state.
- All reports and documentation are completed correctly to required specifications.