Elements and Performance Criteria
- Determine job requirements
- Comply with work health and safety (WHS) requirements at all times
- Use appropriate personal protective equipment (PPE) in accordance with SOPs
- Identify job requirements from specifications, drawings, job sheets or work instructions
- Install/replace fluid power systems and controls
- Identify system/circuit components and inspect for compliance with specifications
- Undertake sequential installation according to manufacturers' specifications and SOPs
- Check and adjust fluid power system control sequence and operation
- Perform adjustments to sequence system to meet/align to operational requirements and specifications
- Report modifications/alterations and according to SOPs
- Check controls and system operation and commission to specifications
- Fault find fluid power systems control circuit
- Identify and inspect system/circuit components
- Trace system/circuit and diagnose action of components to identify and localise faults
- Test system/circuit parts using appropriate test equipment and application principles
- Assess system/circuit parts against operational specifications
- Localise fault condition at the component level
- Evaluate faulty condition, analyse root cause and plan corrective action
- Maintain, and repair or rectify system control components
- Select and apply repair procedures using appropriate tools, equipment and techniques
- Test faulty items, repair or replace using sequential installation procedures according to manufacturers' recommendations
- Select replacement items from appropriate sources
- Reassemble system control components according to specifications
- Check and adjust sequence of fluid power system controls
- Make necessary adjustments to sequence system control circuit to meet operational specification
- Check and verify correct operation of system control circuit against operational specification
- Commission fluid power system controls to specifications
- Adopt appropriate follow-up procedures
- Complete service/maintenance report