Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Determine modification requirements
  2. Undertake modifications to fluid power systems
  3. Monitor and evaluate repaired or modified fluid power system

Required Skills

Required skills

Look for evidence that confirms skills in

obtaining interpreting and analysing servicemaintenance reports and system output information

planning and sequencing operations

checking and testing componentssubassemblies for conformance to specification

confirming design faults

obtaining relevant information with respect to the modification requirements

developing an appropriate action plan to overcome system problems

undertaking modifications to fluid power systems where appropriate

delegating work to appropriate personnel where appropriate and supervising work

recordingreporting modifications to the fluid power system

checking the operation of the modifiedrepaired fluid power system for compliance with operational specifications

initiating and monitoring further corrective action where applicable

confirming that desired outcomes are achieved

preparing evaluation reports on the modificationsrepairs

Required knowledge

Look for evidence that confirms knowledge of

fluid power system performance faults history and variations from operational specification

faults attributable to poor design

defective componentssubassemblies

appropriate test equipment and applications

techniques for verifying design faults

personnel to be consulted during the modification process

sources of information relevant to the modification requirements

the specifications pertaining to the selected modificationdesign option

the modificationdesign options available to overcome system faults

the cost and benefits associated with the available options

the most appropriate modificationdesign option

the procedures for undertaking the selected modificationdesign option

replacement components conforming to predetermined specifications from manufacturers catalogues

the modifications to be undertaken

the requirements for recordingreporting modifications to fluid power systems

the revised operational specification of the fluid power system

the frequency of checks for compliance against operational specifications

the effectiveness and efficiency of the modificationsrepairs

any variations from operational specifications

any further modificationsrepairs that could improve the effectiveness and efficiency of the fluid power system

personnel to whom recommendations are to be made

the appropriate reporting requirements

hazards and control measures associated with modifying fluid power system operation including housekeeping

safe work practices and procedures

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

A person who demonstrates competency in this unit must be able to modify fluid power system operation Competency in this unit cannot be claimed until all prerequisites have been satisfied

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria including required knowledge and be capable of applying the competency in new and different situations and contexts

Context of and specific resources for assessment

This unit may be assessed on the job off the job or a combination of both on and off the job Where assessment occurs off the job that is the candidate is not in productive work then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team The assessment environment should not disadvantage the candidate

This unit could be assessed in conjunction with any other units addressing the safety quality communication materials handling recording and reporting associated with modifying fluid power system operation or other units requiring the exercise of the skills and knowledge covered by this unit

Method of assessment

Assessors should gather a range of evidence that is valid sufficient current and authentic Evidence can be gathered through a variety of ways including direct observation supervisors reports project work samples and questioning Questioning techniques should not require language literacy and numeracy skills beyond those required in this unit of competency The candidate must have access to all tools equipment materials and documentation required The candidate must be permitted to refer to any relevant workplace procedures product and manufacturing specifications codes standards manuals and reference materials

Guidance information for assessment


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Modification

Modifications covered by this unit are changes to fluid power systems and equipment that lead to desired changes in system performance

Analysed

Interpretation and integration of data from process controls, instrumentation and condition monitoring systems and consultation with appropriate personnel