Elements and Performance Criteria

  1. Determine design specification for basic single zone duct distribution system

Required Skills

Required skills

Required skills include

selecting airdiffusion

sizing the system

selecting fans

designing duct work

applying cost controlling strategies

using D CAD systems effectively

interpreting drawings and specifications

communicating effectively with others

working in teams with others

communicating technical and procedural requirements to others

dealing effectively with unexpected situations

Required knowledge

Required knowledge includes

differentiation between static velocity and total pressure in air distribution ducts

laminar and turbulent flow

use of Moody diagram for flow rate and pressure drop

friction and dynamic pressure loss

ColebookWhite formula

sources of heat and pressure leakage and loss calculation

noise minimisation

fan laws

control cost parameters

duct design parameters including

standard duct sizes and gauges

available access and space

system performance requirements

system sizing and balancing methods

dual and single duct constant volume air systems

variable volume air system

multizone systems

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

A person who demonstrates competency in this unit must be able to design basic single zone duct distribution systems to meet customer requirements including cost specifications and WHS and other regulatory requirements

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently

implement WHS workplace procedures and practices including risk control measures

design basic single zone duct distribution systems to customer performance and cost requirements

select and size appropriate components including fans and duct work

communicate technical requirements to others including preparation of required drawings CAD files and reports

Context of and specific resources for assessment

This unit may be assessed on the job off the job or a combination of both on and off the job Where assessment occurs off the job then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations

The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team The assessment environment should not disadvantage the candidate

Method of assessment

Assessment must satisfy the endorsed Assessment Guidelines of the MEM Metal and Engineering Training Package

Assessment must satisfy the endorsed Assessment Guidelines of the MEM05 Metal and Engineering Training Package.

Assessment methods must confirm consistency and accuracy of performance over time and in a range of workplace relevant contexts together with application of underpinning knowledge

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure correct interpretation and application

Assessment may be applied under projectrelated conditions real or simulated and require evidence of process

Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstance but is able to be transferred to other circumstances

Assessment may be in conjunction with assessment of other units of competency where required

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

WHS requirements

WHS requirements include:

relevant legislation

protective equipment

material safety management systems, including use of material safety data sheets (MSDS)

hazardous substances and dangerous goods code

local safe operation procedures

WHS provisions in relevant awards and agreements

Environmental requirements

Environmental requirements include:

relevant legislation, regulations and codes

correct handling and disposal of liquid and solid waste

elimination or minimisation of gas, fume, vapour and smoke emissions, including fugitive emissions

dust elimination, minimisation and control

minimisation of energy and water use

elimination or control of excessive noise

use and recycling of refrigerants

Single zone duct distribution system

A single zone duct distribution system is a basic central system which can supply a constant air volume or a variable air volume at low, medium or high pressure through a single duct

Appropriate personnel

Appropriate personnel may include:

supervisor

leading hand

foreman

manager

engineer

technician

trainer

mentor

team member

customer

client

Enterprise procedures

Enterprise procedures may include:

use of tools and equipment

operating instructions, including job sheets, plans, drawings and designs

reporting and communication

manufacturer specifications

site operational procedures

references to industry standards

Resources

Resources may include:

reference manuals

scientific calculator

3-D CAD software

computer workstation and software, either stand alone or networked

test apparatus

appropriate tools of trade, equipment and materials

standard duct sizes and gauges

Contingencies and unexpected situations

Contingencies and unexpected situations that arise during the course of the design process may include:

cost or time overruns

unavailability of required components

changes in customer requirements after design process has started

regulatory change

site or building features not on plans or drawings

other situations not included in customer brief or normal enterprise procedures