Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for work
  2. Complete on-site preparation
  3. Set up job under supervision
  4. Undertake water jetting job in accordance with procedures
  5. Complete job
  6. Prepare for work
  7. Complete on-site preparation
  8. Set up job under supervision
  9. Undertake water jetting job in accordance with procedures
  10. Complete job

Required Skills

Required skills

Required skills include

recognising conditions which will lead to out of specification product or unsafe situation

implementing the enterprises procedures in a manner relevant to the correct use of the equipment

conveying information relevant to the operation of equipment clearly and effectively

maintaining appropriate levels of environmental controls and quality assurance

reading and interpreting safety data sheetsSDS

recognising equipment problems and taking action to prevent equipment failure

reading and numeracy to interpret workplace documents instrumentation and technical information

Required knowledge

Required knowledge includes

hazards associated with the process plant and equipment where water jetting is to be carried out

high pressure water jetting hazards

injuries resulting from high pressure water jets and appropriate responses

application of the hierarchy of control in controlling the hazards

relevant safety signs and symbols

fundamentals of hydraulics

basic understanding of reaction force and its determination

relevant communication systems including hand signals

basic principles of heat stress fatigue hydration physiology biomechanics as applied to water jetting

basic principles of how high pressure water jetting nozzlesjets work

basic understanding of diesel engine systems

basic principles only of pressure and flow relationships

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Critical aspects for assessment and evidence required to demonstrate competency in this unit

It is essential that use of equipment is understood and that the importance of critical properties settings and readings is known Competence must be demonstrated in the operation of equipment to the level required for this unit of competency

Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective actions

Holistic assessment of this unit of competency with other related units is preferred

Consistent performance should be demonstrated In particular look to see that

hazards are identified and controlled

job is completed efficiently and to required standards

quality is monitored

required measurementsobservations are continually made

all health safety and environment HSE requirements are followed

problems are anticipated and appropriate action is taken ie problem fixed or reported

The assessor should be able to demonstrate competence in water jetting operations and have adequate industry experience with three to five years being a guideline in water jetting

Context of and specific resources for assessment

Assessment will require access to operating equipment over an extended period of time or a suitable method of gathering evidence of operating ability over a range of situations

Assessment will occur over a range of situations which will include disruptions to normal smooth operations

Simulation or case studiesscenarios may be required to allow for timely assessment of parts of this unit of competency Simulation should be based on the actual plant and will include walkthroughs of the relevant competency components A bank of scenarioscase studieswhat ifs and questions will be required to probe the reasoning behind observable actions

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Procedures

All operations are performed in accordance with standard procedures. Procedures may be written, verbal, computer-based or in some other form, and may include:

all work instructions

standard operating procedures (SOPs)

Australian standards

Guidance Notes

formulas/recipes

batch sheets

temporary instructions

any similar instructions provided for the smooth running of the plant

good operating practice as may be defined by industry codes of practice (e.g. Responsible Care) and government regulations

Site access requirements

Site access requirements may include:

site induction

other site/client requirements

Work control requirements

Work control requirements may include:

client/site requirements, such as permits or other authorities to enter site, commence and continue work

Prepare equipment

Preparation of required equipment may include:

selecting (e.g. from store) equipment needed for the job, under direction

checking equipment is in appropriate condition for the job, under supervision

checking equipment is within inspection date

loading equipment onto truck or similar, as directed

filling fuel and ensuring adequate supply of other consumables, as directed

Equipment

Equipment may include:

pump

pump motor/driver

hoses

guns, lances and nozzles

personal protective equipment

other equipment, plant, tools and hazard control devices required for the job

Job owner

Job owner may include:

client or their representative

site manager or their representative

production manager or their representative

maintenance manager or their representative

other person with prime responsibility for the plant/plant area which is the subject of the water jetting

Job paperwork

Job paperwork may be electronic, hard copy or other format and may include:

tool storeroom records

equipment loaded records

maintenance/inspection records/checklists

tag out/reports for failed equipment

hazard controls

work packs

Personal protective equipment

Personal protective equipment may include:

personal protective equipment as specified in:

Section 4 AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement

Section 5 Safe Work Australia Guide for Managing Risks from High Pressure Water Jetting December 2013, or its authorized replacement

medical alert card as specified in Section 9.5 of AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement

other equipment as required

Liaise with job owner

Liaise with job owner may include:

confirming job owner needs and standards

confirming job and job site

checking job owner is satisfied with completed job

confirming compliance with site requirements

other job owner communications

Job pack

Job pack may include:

permits/clearances

safe work method statements

job safety and environment analysis (JSEA) or other hazard analysis and control information

Safety Data Sheets (SDS)

Water

Water is to be checked for appropriate:

amount (volume and pressure)

quality/properties

availability

Waste disposal

Waste disposal checks ensure that waste generated will be disposed of in an environmentally appropriate manner and in accordance with site requirements. Waste may include:

contaminated water

material removed by water jetting

fuel or similar waste

other wastes

Worksite preparation

Worksite preparation may include:

establishing exclusion zone (e.g. with barricades or tape)

fixing signage

ensuring safe footing for personnel

participating in/verifying isolations

Prepare water jetting equipment

Preparing water jetting equipment may include:

interpreting equipment markings

assembling equipment

checking electrical earth

flushing equipment

visual inspection of hoses

Communication

Communication may include:

hand signals

radio head phones

other appropriate means

Hazards

Hazards may include:

high pressure hazards

site/process hazards

hazards arising from materials in job site, including materials being removed by water jetting

hose set-up and hose runs

Hazard controls

Hazard controls may include:

appropriate controls for all hazards identified

controls identified in the relevant permits to work

controls required by AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement

other appropriate controls

Job conditions

Job conditions may include:

total work hours (for day/from base)

rest/rotation periods

weather

heat stress symptoms

site conditions

Monitor job and equipment

Monitoring job and equipment includes monitoring as directed:

the pump

system efficiency

product quality

mechanical equipment

Appropriate action

Appropriate action includes:

recognising actual and potential problems

determining problems needing action

determining possible fault causes

rectifying problem using appropriate solution within area of responsibility

following through items initiated until final resolution has occurred

reporting problems outside area of responsibility to designated person

Solutions

Solutions may include:

activating emergency switch

stopping work until situation resolved

raising alarm

responding to injury

Health, safety and environment (HSE)

All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through federal or state/territory legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence