Elements and Performance Criteria
- Prepare for installation
- Applicable work health and safety (WHS), legislative and organisational requirements relevant to the preparation for the installation of carpets are verified and complied with
- Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
- Sub-floor condition is assessed for the type of carpet cushion underlay/floor covering to be installed
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Suitable adhesives, fixing trims and accessories are selected
- Materials are laid out to meet specification requirements and to minimise waste
- Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
- Set out materials
- Carpet cushion/underlay and gripper accessories to be installed are checked against order
- Carpet cushion/underlays are acclimatised according to manufacturer recommendations
- Carpet grippers are fitted in accordance with specifications, plan and/or enterprise procedures
- Metal mouldings are fitted at thresholds and abutments to other flooring surfaces in accordance with specifications, plan and/or enterprise procedures
- Lay floor covering
- Instructions and sequence for laying and fixing are followed
- Underlay is cut to required shape with minimum waste of materials
- Materials for fixing are organised and used in accordance with relevant safety management requirements
- Underlay is fixed using methods and equipment which follow manufacturer instructions
- Complete housekeeping