Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare materials for installation
  2. Set out materials for installation
  3. Lay out flooring
  4. Lay flooring
  5. Complete housekeeping

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Legislative requirements include:

applicable legislation from all levels of government that affect organisational operation

award and enterprise agreements

industrial relations

Australian Standards

confidentiality and privacy

WHS

the environment

equal employment opportunity (EEO)

anti-discrimination

relevant industry codes of practice

duty of care and heritage

WHS requirements include:

Commonwealth, state or territory legislation and regulations

organisational safety policies and procedures

the use of personal protective equipment and clothing

firefighting equipment

first aid equipment

hazard and risk control and elimination

control of hazardous materials and substances

manual handling, including lifting and carrying

Organisational requirements include:

legal, organisational and site guidelines

policies and procedures relating to own role and responsibility

quality assurance

procedural manuals

quality and continuous improvement processes and standards

WHS

emergency and evacuation

ethical standards

recording and reporting

access and equity principles and practices

equipment use, maintenance and storage

environmental management (waste disposal, recycling and re-use guidelines)

Instructions include:

workplace procedures relating to the use and operation of tools and equipment

workplace instructions, instructions, including job sheets, plans, drawings and designs

workplace procedures relating to reporting and communications

manufacturer instructions for the use of equipment and materials

Sub-floor assessment includes:

testing for moisture content, expansion, rot, structural strength, smoothness and plane

Tools and equipment include:

drop saw

jig saw

hand saw

undercut saw

plunge saw

hammer

bar scriber

utility knife

circular saw

bench saw

straight edge

glue gun

staple gun

nailers

flooring cramps

strap clamps

wall clamps

Materials include:

flooring materials

underlay

edge strips

tapes

adhesives

Adhesives include:

polyvinyl alcohol (PVA)

epoxy

polyurethane elastomeric


Performance Evidence

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing laminate timber and bamboo flooring, including ventilation standards

Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment

Follow work instructions, operating procedures and inspection practices to:

minimise the risk of injury to self and others

prevent damage to goods, equipment and products

Complete the following different types of installation:

glue-together system

self-locking system

inserted plastic tongue system

Modify activities to cater for variations in workplace contexts and environment

Collect, organise and understand information related to work orders, basic plans and safety procedures

Communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems

Use pre-checking and inspection techniques to anticipate installation problems to avoid re-work and wastage

Recognise and respond to circumstances outside instructions or personal competence

Plan and organise activities, including the preparation and layout of the worksite and the obtaining of equipment and materials, to avoid any backtracking, work flow interruptions or wastage

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate other material requirements

Maintain current knowledge of:

tools and materials

laminate timber and bamboo flooring installation techniques

Use the limited workplace technology related to the installing requirement, including tools, equipment, calculators and measuring devices


Knowledge Evidence

State or territory WHS legislation, regulations, standards and codes of practice relevant to the installation of laminate timber and bamboo flooring

Organisational and site standards, requirements, policies and procedures for the installation of laminate timber and bamboo flooring

Types, characteristics, uses and limitations of:

laminate timber flooring

bamboo flooring

installation adhesives

underlays

The types and uses of installation tools and equipment

Workplace safety systems relevant to the installation of laminate timber and bamboo flooring

Characteristics and requirements of sub-floor preparation

Work flow in relation to flooring installation operations

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Appropriate mathematical procedures for estimation and measurement

Procedures for the recording, reporting and maintenance of workplace records and information