Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Identify and analyse work requirements
  2. Develop a work plan
  3. Estimate materials, time and labour
  4. Calculate costs
  5. Document details and verify, where necessary

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Australian Standards include:

AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

AS 1884-2012 Floor coverings - Resilient sheet and tiles - Installation practices

Site conditions include:

access requirements

building project status

power supply

lighting

temperature

humidity

heating/cooling requirements

ventilation

other site-based activities and security arrangements

Detailed work plan includes:

a plan with sufficient detail for an auditable costing of the work covering:

work area isolation/protection

work permits, as applicable

work timings and program

floor preparation

covering/installation

finishing

personnel and timings by labour type

transportation methods and costs

Materials include:

floor preparation materials:

primers

cementituous products

aggregates

sands

carpeting materials:

floor covering protection materials

underlay

carpet cushion

gripper strips

metal mouldings

PVC fittings

carpet

adhesives

primers

resilient flooring materials:

floor covering protection materials

linoleum

vinyl

rubber

adhesives

primers

PVC and metal mouldings

polishing and finishing materials:

floor covering protection materials

coatings

catalysts

fillers

discs

belts

other consumables

timber flooring materials:

floor covering protection materials

timber product

fixings

Tools and equipment include:

floor preparation:

grinders

scarifiers

demolition equipment

compressors

generators

carpet laying and resilient flooring operations:

hoisting and cartage

generators

compressors

polishing and finishing operations:

edge sander

floor sander (belt or split drum)

rotary sander

orbital sander

generators

compressors

timber flooring:

nail gun

generators

compressors

Labour requirements include:

normal and overtime estimates and include both direct and indirect costs covering employees and contractors

Information and procedures include:

industry codes and symbols

product designs, patterns and prototypes

building/architectural plans

Australian, international and enterprise quality standards and procedures

work scheduling documentation

job procedures

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures


Performance Evidence

Interpret work order and locate and apply relevant information

Identify materials used in the work process

Follow work instructions, operating procedures and inspection

Document and communicate work-related information, including:

customer requirements

products

materials and labour required

costing calculations for products

materials and labour

special conditions

Use calculators, computer programs and other aids in the estimation and cost calculation processes

Estimate and cost three (3) varied jobs, including:

estimate quantities of material required

determine the types and amount of labour required to complete the work

estimate time required to complete the work

estimate overheads associated with the job

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity


Knowledge Evidence

State or territory WHS legislation, regulations, standards and codes of practice relevant to the planning and costing of flooring technology work

Australian Standards, including AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General, and AS 1884-2012 Floor coverings - Resilient sheet and tiles - Installation practices

Preparing and presenting design information

Organisational and site standards, requirements, policies and procedures for preparing and presenting design information

Floor preparation methods and techniques

Floor covering, installation and finishing techniques applicable to the required streams

Types of major tools and equipment, their applications, planning and costing techniques and data

Costing techniques for labour and materials

Overhead components and costing techniques

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution