Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for installation
  2. Set out materials
  3. Lay carpet flooring
  4. Complete housekeeping

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Adhesive fixed carpets include:

tufted carpet

fusion-bonded carpet

woven carpet

needle punched carpet

foam-backed carpet

rubber-backed carpet

PVC-backed carpet

styrene-butadiene (SBR) latex foam underlay

fibrous and bonded foam underlays

Tools and equipment include:

knee kicker

water roller

carpet wall trimmer

carpet stair tool

hammer

tape measure

trimming knife

spiked carpet roller

carpet spreader

notched trowels and paint rollers

carpet shears

napping shears

loop pile cutter

cushion backed cutter

heat seaming irons

electrical leads

seaming board

heat seaming tapes

seam sealer

earth leakage device

Materials include:

architectural gripper strips

metal mouldings

cover strips

PVC trims

primers

Adhesives include:

plasticised and rubber resin acrylic

water and solvent-based adhesives

solvent-based contact adhesive

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures


Performance Evidence

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of the following:

one (1) direct stick carpet installation using a PVC-backed carpet to connecting rooms, including at least one (1) cross join and one (1) seam join

one (1) dual-bond carpet installation using a woven carpet to connecting rooms, including at least one (1) cross join and one (1) seam join

one (1) dual-bond carpet installation using tufted carpet and pre-applied adhesive underlay to connection rooms, including at least one (1) cross join and one (1) seam join using gripper strips and heat bond tape

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity


Knowledge Evidence

State or territory WHS legislation, regulations, standards and codes of practice relevant to adhesive fixed carpet and underlays carpet systems

Organisational and site standards, requirements, policies and procedures for adhesive fixed carpet and underlay carpet system

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Types, characteristics, uses and limitations of:

adhesive fixed carpets and underlays

installation adhesives

Types and uses of adhesive fixed carpet installation tools and equipment

Workplace safety system requirements, including ventilation needs, related to the installation of adhesive fixed carpets

Characteristics and requirements of sub-floor preparation

Work flow in relation to the cutting, laying, fixing, joining and finishing of adhesive fixed carpet