Elements and Performance Criteria
- Prepare for installation
- Identify and follow work health and safety, legislative and organisational requirements
- Read documentation and identify work requirements
- Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
- Select adhesives, trims and accessories based on job requirements
- Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
- Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
- Check resilient sheet against work order and acclimatise in accordance with manufacturer recommendations
- Prepare walls
- Establish a mixing station in safe and suitable location, and position and prepare materials and equipment
- Make trial applications of surface materials to check equipment operation, materials consistency and specified surface finish
- Apply surface coating to required depth and coverage in accordance with manufacturer specifications and job requirements
- Check internal and external corners for square,
- Check wall surfaces for plane, and smooth and clear for further processing
- Set out coverings
- Identify and follow instructions and sequence for laying and fixing
- Organise resilient sheets for fixing and use in accordance with safety management requirements
- Establish working lines and starting point
- Cut and fit pre-form fillet in accordance with job requirements
- Prepare feathering systems and applications and apply in accordance with the installation plan and manufacturer instructions
- Install resilient sheet
- Lay out resilient sheet to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as per installation plan
- Maximise the aesthetics of the materials, where appropriate, matching grains, colours and patterns
- Cut materials to length and size, allowing for final adjustment, trimming and welding processes
- Apply adhesives in accordance with manufacturer instructions
- Position, press out and hand-roll resilient sheet in accordance with manufacturer instructions
- Heat resilient sheet to form required profiles
- Prepare seams and weld in accordance with manufacturer instructions
- Trim joins and/or seams and finish in accordance with manufacturer instructions
- Check completed installation for flaws in installation and materials and rectify faults following workplace procedures
- Complete housekeeping