Elements and Performance Criteria
- Determine job requirements
- Follow standard operating procedures (SOPs)
- Comply with work health and safety requirements at all times
- Use appropriate personal protective equipment (PPE) in accordance with SOPs
- Identify job requirements from plans, specifications, drawings, quality requirements and operational details
- Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
- Identify and implement signage and/or barricade requirements
- Inspect subfloor and joists for flatness and structural integrity and correct as required in accordance with SOPs
- Inspect timber flooring material and confirm species, grade, size and quantity against work orders
- Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
- Set out and plan installation method in accordance with job requirements
- Prepare materials in accordance with client specifications
- Install timber flooring
- Select appropriate flooring materials for the intended use according to specifications
- Confirm floor measurements and flooring materials to ensure minimum waste and prepare for installation
- Install flooring, as specified by the client, using suppliers recommended products ensuring product is installed and secured to manufacturer recommendations, industry and Australian Standards
- Complete installed flooring in preparation for sanding and finishing
- Complete housekeeping