Elements and Performance Criteria
- Identify plant set-up requirements
- Required specifications for glass processing are identified and interpreted for process application
- Plant machinery and ancillary equipment are identified and checked for safe and effective operation, including emergency stops, gauges, guards and controls
- Procedures for checking the quality of glass produced, working condition of equipment, and quality requirements for each stage of the process are identified
- Set machine/s
- Sequence of glass processing operations is determined and plant machine/s set or programmed accordingly
- Plant machine/s and programs are adjusted to meet glass product specifications and operational requirements.
- Plant pre-start, start-up and set-up procedures are completed in accordance with manufacturer instructions and workplace procedures
- Trial program
- Identify abnormal plant and/or process performance
- Identify causes of substandard performance
- Maintenance records are examined to ensure that plant machinery and equipment does not require simple maintenance
- Calibration records are accessed and equipment tested to determine if plant is operating within calibration
- All plant and testing variables are evaluated to identify possible causes of substandard performance and equipment isolated using appropriate elimination techniques
- Rectify plant faults
- Instruct machine operator