Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Establish work requirements and prepare for work
  2. Lay out work to be sewn
  3. Stitch seams and form corners
  4. Sew gathering materials
  5. Finish work
  6. Complete work for next process

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Austrian festoon-style blinds include:

Austrian

festoon

London

balloon

cloud

Tools and equipment include:

industrial sewing machines

measuring equipment

stapler

drill

saw

Materials include:

lining

interlining and curtain fabrics, including lace

fabric-lined and unlined blinds

fasteners

threads

Work order requirements include:

widths and numbers of finished blinds

seam allowances and types

number and widths of panels

lining and any interlining

contrasting edging

required fasteners and other materials

mounting style headboard or track requirements

Machine sewing operations include:

straight stitching along seam lines from the face to the lower edge of the material,

securing of beginning and end of threads

stitching is even and appropriate seam stitch type, length and visibility

seams are flat

finished components match work requirements

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures


Performance Evidence

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Identify materials used and any special sewing requirements measure accurately and construct at least two (2) Austrian festoon-style blinds to required size and accuracy

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity