Elements and Performance Criteria
- Load agitator
- Deliver concrete
- Conform to site protocols
- Check access to site with customer
- Assess site conditions and enter in a manner suited to the conditions, load and site requirements
- Mix concrete on site according to quality requirements
- Discharge concrete as required by customer
- Wash down chutes and agitator in the area designated by the customer
- Complete all records
- Rectify routine problems
- Control hazards
- Identify concrete delivery hazards
- Assess the risks arising from those hazards
- Implement measures to control those risks
- Check job requirements
- Position agitator for loading
- Load agitator with correct concrete batch
- Check and action any special requirements
- Check that slump is to specification and make necessary adjustments
- Deliver concrete without delay
- Position vehicle or agitator as required by safety needs and if practical customer requirements
- Report breakdowns or lengthy delays en route to relevant person
- Maintain product quality as per requirements and procedures