Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Respond to indicator of demand
  2. Make products or deliver service to demand
  3. Update demand information as required
  4. Recommend improvements

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Competitive systems and practices include one or more of:

lean operations

agile operations

preventative and predictive maintenance approaches

statistical process control systems, including six sigma and three sigma

Just in Time (JIT), kanban and other pull-related operations control systems

supply, value, and demand chain monitoring and analysis

5S

continuous improvement (kaizen)

breakthrough improvement (kaizen blitz)

cause/effect diagrams

overall equipment effectiveness (OEE)

takt time

process mapping

problem solving

run charts

standard procedures

current reality tree.

JIT requires availability:

precisely when the service, product or operation is to be produced or undertaken

in the right quantity and at the right quality.

Product includes one or more of:

a physical product

a supporting utility service, such as water, gas and power

some other service (e.g. cranes and forklifts).

Indicator of demand includes one or more of:

kanban bin, ticket or similar

some other indicator of demand pull which authorises production or movement of an item (in some plants, this may also include authorisation using SCADA software).

Procedures (written, verbal, visual, computer based, etc.) include one or more of:

work instructions

standard operating procedures (SOPs)

safe work method statements

formulas/recipes

batch sheets

temporary instructions

any similar instructions provided for the smooth running of the plant.


Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy the requirements of the elements and performance criteria and include the ability, for one (1) or more JIT procedures, to:

identify the indicators of demand and the flow authorisation system in their own workplace

relate products and services supplied by suppliers and customers to the flow authorisation system

interpret received indicators of demand correctly for quantity, quality and time of delivery

contribute suggestions for improvement.